Herisau

Scroll to explore

Overview

Reconnecting Herisau’s station with the village through landscape, housing, and public space.

Details

Industry

Urban Design

Date Completed

2023

Team

Dagnija Smilga, Beatrise Šteina

Collaboration

Hosoya Schaefer Architects AG, Studio Vulkan, TEAMverkehr

Location

Herisau, Switzerland

Commission

Feasibility study

Client

Gemeinde Herisau, Appenzeller Bahnen AG

The Bahnhofstrasse Nord feasibility study explores the transformation of a prominent site between Herisau’s railway station and the historic town centre. The project presents an unusual architectural and technical challenge: an active railway line passes directly through the proposed building, while an existing railway signalling facility, together with its complex network of cables and technical infrastructure, must be preserved and integrated into the development. Combined with the site's steep topography and significant differences in elevation, these constraints shape the architectural approach. The project investigates how new buildings, active ground floors, public spaces and pedestrian connections can work around the existing infrastructure while strengthening the relationship between the railway station and the town centre.

Concept

Three buildings are arranged like the three ridges of the Alpstein, forming a spatial transition between the station and the village and reconnecting the lowered station area with the settlement. A wide, gently ascending staircase leads from the station square to the plateau over the tracks, offering views toward the church and the village. The development is primarily residential and located close to the station, with public-oriented ground-floor uses along the main pedestrian route.

Open Space

The project reinforces Herisau’s terrain-based urban landscape by creating a sequence of small-scale connected spaces between the station and the town. The station plateau forms the central public space, offering wide views over the tracks and toward the church along Bahnhofstrasse. In the plaza's centre a shallow rainwater collection is planned, functioning as a seasonal landscape element and retention basin for surface and roof water.

Toward the tracks, a recessed seating step creates a “balcony over the tracks” overlooking the station square and bus terminal. A second staircase descends along the slope back to track level, where an ecological “track garden” is created to support local flora and fauna, with selective seating integrated. Along Bahnhofstrasse, the landscape structure responds to the two sides of the street. The southern building is integrated into the densely vegetated hillside with a garden.

Buildings

The three buildings form a coherent spatial sequence with individual qualities. The northern building, positioned at the roundabout, accommodates retail and office spaces on the ground floor, with residential entrances located beneath arcades along its northern and eastern sides. Facing the roundabout, the generous interior height allows for flexible office, studio, or larger public-oriented uses. Bicycle parking and a public elevator are located beneath the balcony over the tracks and staircase. Inner courtyards, loggias, and balconies allow noise-protected ventilation. Different floor plan layouts are possible.

The middle building could be used for senior housing. A café activates the western side of the plaza. The greenery is placed on the building's east and west sides. Ramp is located in this building with access to shared underground parking. A ramp in the middle building allows parking to be optimized in size, meets infrastructure requirements and allows a later phasing of the southern building. The southern building is exclusively residential, including the ground floor. All three buildings have roof access and large shared rooftop terraces with pergolas.

Infrastructure & Implementation

Staircases from Bahnhofplätzli provide pedestrian access to the railway platform. Two parking levels are located beneath the plaza. Delivery access is planned from the north via a new railway crossing. The signal control system is located on the parking level.